Initializing Signals
By Invitation Only

The satellite observes reality.
Everything else is a delayed reflection.

Physical lithium supply signal derived from 1,027 satellite observations. Four sites across Chile and Argentina. ~3 month lead over public disclosures.

Request Pilot Access

Lithium Mine
Financial Hub
LithosInt v0.1
1,027
Satellite Observations
Across 4 Sites (2019–2025)
~86 Days
Avg. Lead Time
Before SEC 6-K Filing
4 Salars
Chile & Argentina
Major Brine Operations
Weekly
Signal Delivery
Every Monday 06:00 UTC
The Signal

Physical supply signal. Not a model.

Operators cannot increase lithium output without expanding pond area, and cannot hide reductions once contraction begins. The satellite sees both.

Atacama Pond Area vs. SQM Output Sample
▬ Pond Area (km²) ● SQM Quarterly Output
R² 0.91
Xiang et al.
86d
Lead Time
Weekly
Delivery

Atacama: pond area shift detected ~3 months early

SQM's industrial pond area declined ~14% from peak — visible in satellite data quarters before SEC 6-K filings. A physical observable, not a statistical pattern.

Cauchari: commissioning tracked in real time

Ganfeng / Lithium Americas Phase 1 — industrial pond construction monitored week by week since 2022. Ramp-up visible before any public disclosure. 127 observations and counting.

PDF + Excel + API

Time-series data, MNDWI heatmaps, cloud-quality scores. Compliance-ready. Model-ready. Monday 06:00 UTC, every week.

Methodology

Open data. Auditable pipeline.

ESA Sentinel-2 L2A. MNDWI spectral index. Validated by Xiang et al. You can replicate every step — we publish the methodology.

01

Sentinel-2 L2A

10m resolution. 5-day revisit. Automated cloud masking. Free ESA imagery — no proprietary lock-in, fully auditable.

02

MNDWI Pond Detection

(Green - SWIR1) / (Green + SWIR1). Threshold > 0.10, tuned for Atacama saline environment. Isolates active brine ponds from salt flat background.

03

Area-to-Production Model

Pond area in km² (UTM 19S). Rolling 12-week trend. Academic benchmark R² = 0.91 (Xiang et al., 2022). Our independent replication in progress.

Coverage

Four salars. Two countries. Six years of data.

Chile + Argentina — the world's largest brine-based lithium operations. 1,027 observations. Bolivia and additional sites on roadmap.

Site Country Operator Status
Salar de AtacamaChileSQM / Albemarle299 scenes
Salar de OlarozArgentinaRio Tinto (ex-Allkem)280 scenes
Hombre MuertoArgentinaRio Tinto / POSCO321 scenes
Cauchari-OlarozArgentinaGanfeng / Lithium Americas127 scenes
Salar de UyuniBoliviaYLBRoadmap
1,027
Total satellite observations across all active sites
6 Years
Continuous monitoring history (2019–2025)
~86d
Average lead time before SEC quarterly filings
Access

Limited distribution. By application only.

We work with a limited number of counterparties to preserve signal integrity. Access is provided through pilot evaluations and annual institutional subscriptions.

Typical engagements range from mid-five to low-six figures annually, reflecting the exclusivity, 60–90 day lead time, and direct alpha potential of the physical supply signal.

Request Pilot Access

Currently covering lithium brine operations.
Additional commodity verticals in development.

Pilot

30-day evaluation with historical dataset and one live report cycle. Validate the signal against public filings before committing.

Institutional

Full weekly delivery (PDF + Excel + API), all covered sites, anomaly alerts, dedicated analyst. Annual engagement.

Enterprise

Custom AOI, global coverage, raw data feed, model integration. Exclusivity options available. Multi-year terms.

Your supply model has a blind spot.

We'll send you last quarter's satellite data alongside SQM's published 6-K. See what the satellite showed — and when. Then decide.

Request Pilot Access